Sunday, February 08, 2009

Work in Progress

The contractor started hacking work on Monday, and was supposed to finish it on Wednesday; we went to take a look on Wednesday evening and they were already tiling the toilets! Went to take a peek again on Saturday, and they are plastering the walls right now.

The house looks rather strange with the rail-less staircase; we could see all across to the balcony through it. Everything is everywhere, and tiles are all there in their packaging ready to be used.

This is the kitchen, with the corner wall hacked so that it is more 'open'. Eventually there will be a glass wall around the corner, and a swinging glass door too, all to let the light in. The kitchen does looks much better without the toilet.

The master bedroom toilet has been tiled already, and it looks pretty good, according to what we want.

Can't resist the view from the bedroom everytime I'm there...


This has been the most expensive weekend for us - we just returned from Harvey Norman today and blew $1860 there for the fridge, washing machine, microwave, a handheld vacuum, hifi, rice cooker etc. I have to say that the sale is genuine and good lah. Another $1800 was spent on the bed yesterday. And the airconditioning's gonna cost us $3.3k soon. Coupled with the previous $1.5k spent on the sofa and console and $2k for the stuff from Barang Barang, that's over 10k leow!

Oh, I forgot the lights...oops.